Just a little off the top please.
The rear roof is gone along with the second floor old bathroom walls.
looking up from where the tub used to be.
Old sink home
Old toilet home
Reconfigured bathroom.
New rear window opening
New sink and toilet (wall hung) on the second floor.
with the tile floor almost done.
The back of the house should be gone by Monday. Ah...addition by subtraction.
only took two weeks, right?
ReplyDelete