Thursday, February 10, 2011

Day 147 / 108

More progress in the kitchen.  Bar top is in! and some back splash.


And appliances arrived on Tuesday and went in yesterday.  Stove and Dishwasher (aka Garcia)


 New Fridge too...  The blue comes off.


And the basement windows are now in place. 



 And Wicked Awesome's pad has half its flooring in.  Just waiting on the rest of the material to arrive.


We're getting close.

Sunday, February 6, 2011

Day 143 / 104

So its been awhile so we've got lots to report!

The first coat of the fiberglass roof went down. Building Wrap as also put on the exterior walls and insulation was added on the inside.

And the drywall arrived.


Drywall went up in the back room.

The dining room has also been drywalled.  The plywood is temporary, just waiting for the glass garage door to be installed.



                          

The 2nd floor (and 3rd floor bathroom) were painted.

                          

The windows and brick cutouts on the 2nd floor were framed.

                      

                          

The plumbers came and installed the sink,shower & toilet in the 2nd floor bathroom.  The bathroom just needs light fixtures and a mirror.




In the kitchen, walnut was installed on the side of the bar.


 The concrete bar & counter tops were pored.

                                  

Counter tops and cabinets were installed.


Kitchen sink has a faucet and is now operational.
 
                                                


Dishwasher is in place (but not hooked up yet).


The new stove, refrigerator and one missing cabinet will be delivered on Tuesday.