Today insulation was added on the 1st and 2nd floor in preparation for drywall...
A wing wall was added at the bar in the kitchen that we will eventually put shelves into.
In bathroom news---
Grout was added in the areas around the toilet and the TUB so those fixtures can be set tomorrow.
More to follow soon!!




No comments:
Post a Comment